First U.S. nuclear reactor built from scratch in decades enters commercial operation in Georgia::ATLANTA — A new reactor at a nuclear power plant in Georgia has entered commercial operation, becoming the first new American reactor built from scratch in decades.

  • Wren
    link
    fedilink
    English
    431 year ago

    That or the fear-mongering talking points. That’s what caused our local power plant to be decommissioned, and now those same people are complaining about how much their electrics cost now.

    • @[email protected]
      link
      fedilink
      English
      101 year ago

      The old soviet legacy. And a bit of actual disasters and from the 2 significant ones (hiroshima and chernobyl) half are beacuse of the soviets.

        • @[email protected]
          link
          fedilink
          English
          31 year ago

          on a side notw how people have dies from fukushima in the years since and how many have died from coal? Also you can compare the number of long term health problems

    • EuphoricPenguin
      link
      fedilink
      English
      71 year ago

      Heck, even my college Sociology textbook from OpenStax basically has nuclear fear-mongering baked into one of the later sections.